59280 Armentières
Change language
Product successfully added to your shopping cart
Votre panier
Items : 0 Items : 1

The installation of a terrace on a pedestal is the easiest and quickest method to set up: follow the assembly steps and build your terrace in less than 3 days!
step 1Determine the required spacing, place the pedestals on the ground, adjust them and check everything with a spirit level.
step 2As soon as the installation is level, place the joists in front of the pin located on the head of the pedestals.
step 3Then screw the joists onto the pin of the stud provided for this purpose. This allows for good maintenance.
step 4Finally, attach the wooden slats to the joists using a screwdriver and wood screws.




Model :
Plot terrasse bois ou composite 8/20 mm Rinno plots

Color | Black |
---|---|
Material | Polypropylene |
Warranty | 10 years warranty |
Origin | Manufactured in France |
Conformity | In compliance with the DTU 43.1 and 51.4 |
Resistance | Resisting the acid and basic solutions, the atmospheric agents, the temperatures between -40°C and 60°C |
Load | Resisting the test of crushing with load superior in 1 ton |
Brand | Rinno plots |
Type | Adjustable |
Use | Wooden deck |
Adjustable height | 0.31 to 0.79 in |
Find all the documents that will be useful to you for the realization of your projects
Benoit D. published the 04/01/2022 following an order made on 27/12/2021
Très bien
Laurent P. published the 05/10/2021 following an order made on 20/09/2021
Pratique bonne quaite
Marine B. published the 28/09/2021 following an order made on 18/09/2021
La graduation pour savoir a quelle hauteur se trouve le plot est pratique.
Bertrand B. published the 21/09/2021 following an order made on 15/09/2021
Trés bien
Jérémie B. published the 18/09/2021 following an order made on 01/09/2021
Super qualité
Xavier M. published the 14/09/2021 following an order made on 27/08/2021
Plusieurs rehausse possible
Fabien N. published the 18/07/2021 following an order made on 05/07/2021
Très bon plots
LOIC K. published the 11/07/2021 following an order made on 22/06/2021
RAS.