You cannot place a new order from your country. United States

Carrelage extérieur grès cérame - MOTLEY WEMBLEY - Mirage

MIRAGE

Reference :

shipment in 24/48h
Your orders are shipped
Customer service
Our teams are at your disposal from Monday to Friday from 9am to 6pm
D.T.U. Standards
All our products comply with current standards
secure payment
Our site is protected by an SSL certificate
the guarantees plots-discount.com
 
The steps of installation a terrace on pedestals

The installation of a terrace on a pedestal is the easiest and quickest method to set up: follow the assembly steps and build your terrace in less than 3 days!

 

step 1Determine the required spacing, place the pedestals on the ground, adjust them and check everything with a spirit level.

step Once the installation is level, place the tiles on the head of the pedestals.

step 3Then adjust the height of the pedestals and check everything one last time with a spirit level.

step 4Finally, make the cuts to close the terrace laterally.


Installation of the pedestals
Installation of slabs on pedestals
Adjusting the pedestals
Finishing the terrace
Data sheet

Model : 


Carrelage extérieur grès cérame - MOTLEY WEMBLEY - Mirage


MIRAGE
MaterialPorcelain stoneware
OriginMade in Italy
Resistancestain, frost, abrasion, scratches, mass colored
BrandMirage
UsePorcelain stoneware tiles, Slab terrace on pedestal, glued, on piles and on rail
Thickness2 cm
Get advice from our experts!

Sign up now
to our newsletter

English (United Kingdom)
Change language